Digitalisation

—



  • Fraunhofer tool targets factory peak loads

    Factory energy storage planning is moving from sizing into simulation. Fraunhofer IWU’s ESiP Analyzer models peak-load reduction, renewable self-consumption, storage investment, and operating strategy.


  • Fraunhofer tool targets factory peak loads

    Europe’s storage market is widening beyond cells and cabinets alone. FlexGen and Eos are entering through controls, lifecycle services, zinc-based storage, and regional delivery partnerships.


  • UKPN Services wins Sizewell C SCADA role

    UKPN Services will design Sizewell C construction power control systems. The appointment covers SCADA design for the Construction Electrical Supplies network, supporting monitored and remotely controllable power distribution across the nuclear build site.


  • APsystems expands storage portfolio at Intersolar Europe

    APsystems is widening its storage portfolio for European installer markets. The expanded APstorage range spans balcony solar, residential hybrid and AC-coupled systems, and C&I cabinets.


  • European inverter manufacturing passes 100GW

    Europe’s inverter manufacturing base has passed a strategic capacity threshold. The milestone strengthens regional power-electronics supply as cybersecurity, grid compliance, and industrial resilience become sharper procurement concerns.


  • Dutch grid moratoriums expose connection capacity squeeze

    Dutch grid moratoriums expose the operational cost of connection scarcity. TenneT is using optimisation tools while long permitting cycles continue to slow physical reinforcement.


  • Fraunhofer tool targets factory peak loads

    National Grid is testing shared AI for asset monitoring. Project FoSMo will use common models across transmission and distribution operators.


  • eMabler raises €5.5m for charging software

    eMabler has raised fresh funding for charging software expansion. The Finnish platform is targeting grid-aware EV charging services across Europe.


  • RES launches automated blade inspection software

    RES has launched software for automated wind blade inspections globally. Smart Pilot uses standard DJI hardware to reduce turbine inspection downtime.


  • Nexos to deliver Ascension Island power resilience project

    Nexos will support a lower-carbon Ascension Island power system upgrade. The project will use battery and energy management systems to improve resilience and reduce annual diesel use by 42%.