Skeleton has launched a UPS platform for AI data centres. GrapheneUPS is designed to support power protection, grid compliance, and load stability as high-density compute demand grows.
Finnish DSOs have tested EV charging as distribution flexibility capacity. The pilot used aggregated residential charging loads to assess how household demand response can support local distribution networks.
Germany’s Förderstedt battery project has secured a long-term revenue structure. Next Kraftwerke and ECO STOR will use a hybrid tolling and merchant model for the 300MW/700MWh asset.
Polish renewable sites have exposed sharper battery storage cybersecurity risks. The incident affected communications and control visibility across around 30 wind and solar sites, sharpening scrutiny of operational resilience, protection architecture, and insurance coverage.
SSEN Transmission has selected Jacobs for major strategic grid frameworks. The work covers operational technology cybersecurity, substation design, digital services, and AI-enabled tools across the north of Scotland transmission network.
Europe’s energy digitalisation strategy now has a formal delivery roadmap. The European Commission plan links data centre demand, AI-enabled grid management, smart meters, cybersecurity, and energy data governance as electricity systems become more connected.
Siemens Energy has agreed to acquire Northern Ireland-based Camlin Group. The deal adds grid monitoring, analytics, and asset digitalisation to its digital network portfolio.
Ingeteam has secured EIB backing for advanced electrification technology R&D. The €75m loan will support PV inverters, energy storage, power electronics, electrical-network cybersecurity, and transport electrification.
E.ON warns smart homes investment is needed for fairer transition. A new report with the Purpose Coalition calls for wider access to batteries, flexibility and local energy systems to reduce bills structurally.
AINETUS has joined LF Energy as open-source grid operation software. The AI-assisted system uses supervised learning, reinforcement learning, and human-in-the-loop workflows for transmission grid operations.