Digitalisation

—



  • Power access tightens EMEA data-centre pipeline

    Power availability is tightening fast across EMEA data-centre development pipelines. Grid access, connection timelines, and infrastructure readiness are increasingly determining which planned facilities can become operational capacity.


  • Iberdrola adds satellite data to grid resilience

    Iberdrola is adding satellite intelligence to electricity network resilience planning. Iceye synthetic aperture radar data will support faster assessment of floods, fires, and high-wind impacts across power network assets.


  • Germany fleet charging survey points to integration bottlenecks

    Germany’s fleet charging market is becoming a practical systems-integration problem. USCALE’s 2026 survey shows cost pressure easing as depot charging, charging management software, scalability, and IT architecture become stronger constraints on fleet electrification.


  • Monta and Plugsurfing expand European charging roaming

    Monta has widened charging roaming through a Plugsurfing integration deal. The partnership gives operators using Monta access to more than one million charging points across 26 European countries without separate contracts or technical integrations.


  • CHINT targets grid resilience for AI-era power demand

    CHINT is pushing grid equipment toward higher-load digital infrastructure markets. Its Intersolar Europe showcase covered grid-forming storage, SF6-free MV switchgear, solid-state technologies, and higher-efficiency electrical architectures for renewables, storage, and AI-driven loads.


  • Iberdrola adds satellite data to grid resilience

    Germany is reviewing cybersecurity controls for connected energy infrastructure components. The work covers networked systems, inverter risk, critical IT components, and possible regulatory measures as power electronics become more embedded in grid operation.


  • Iberdrola adds satellite data to grid resilience

    ENA’s Connect Direct has passed its 400,000th low-carbon connection application. The service supports domestic EV charging, solar PV, and heat pump connection workflows.


  • Iberdrola adds satellite data to grid resilience

    ENTSO-E has published new reports on European power market integration. They cover wholesale markets, balancing platforms, cost reporting, and cross-border capacity use.


  • Wallbox adds metered charging reimbursement to Pulsar Pro

    Wallbox has added certified metering to its charger portfolio range. Pulsar Pro integrates MID-certified energy metering into the unit, supporting charging reimbursement across homes, workplaces, shared residential environments, and company-car use.


  • Wallbox adds metered charging reimbursement to Pulsar Pro

    Sunwoda has expanded its European storage and charging portfolio range. The upgraded SunESS H Series combines battery storage, solar-storage-charging applications, AI energy management, dynamic pricing response, peak shaving, backup power, and remote operation capability.