News

—



  • Wärtsilä forms storage joint venture with RCT Solutions

    Wärtsilä will place its storage business inside a joint venture. The RCT Solutions deal gives the BESS integrator a new structure as utility-scale storage faces tighter margins, deeper software requirements, and more demanding delivery expectations.


  • LIA names TECH-X 2026 sponsors

    TECH-X sponsorship points to lighting’s wider technical agenda for 2026. The LIA event will bring standards, connected lighting, sustainability, and design into one Birmingham conference.


  • Allume launches SolShare 2 for flats

    Allume’s SolShare update expands shared solar options for flats nationwide. The new system increases capacity, adds battery integration, and is set for UK installer availability from August 2026.


  • UK research backs overhead grid expansion

    UK grid research keeps overhead transmission firmly in national contention. Government-commissioned studies found undergrounding remains significantly more expensive than overhead lines for major electricity network upgrades.


  • Weihenstephan deploys battery-enabled truck charging

    Weihenstephan’s electric depot links fleet charging with on-site storage control. The brewery has installed fast chargers, modular batteries, rooftop solar, and energy management for electric truck operations.


  • Entrix to optimise German grey co-location project

    Germany’s grey co-location project links batteries with market optimisation models. Entrix will optimise a solar-plus-storage asset where the battery can charge from both PV and the grid.


  • German DC-coupled pilot targets constrained connections

    Germany’s DC-coupled pilot tackles solar storage connection constraints head-on directly. Sigenergy, EnBW, and ZSW are testing whether DC architecture can reduce hardware needs and improve solar-plus-storage economics.


  • ČEZ to convert Orlík hydro units into pumped storage

    Czech pumped-storage plans revive hydro’s role in grid flexibility nationally. ČEZ will convert part of the Orlík hydropower complex into reversible pumped storage while modernising existing turbine units.


  • Romanian salt caverns to host compressed-air storage

    Romania’s compressed-air project revives focus on long-duration electricity grid storage. Airengy and Hagag Europe are targeting salt-cavern storage as Europe searches for alternatives to short-duration lithium systems.


  • Greenvolt commissions Hungary’s largest battery system

    Hungary’s largest battery project moves grid flexibility forward across Europe. Greenvolt’s Buj system adds nearly 289MWh of storage capacity to a market scaling fast from a low operational base.