IN Brief:
- Skanska has completed and trialled an aseismic bearing pedestal demonstrator at its Bentley Works facility in Doncaster.
- The structural component supports isolation devices intended to reduce the transmission of earthquake-induced ground movement into nuclear buildings.
- The trial establishes a proposed manufacturing method, but the complete reactor design and individual power station projects remain subject to separate approval and delivery processes.
Skanska UK has completed an aseismic bearing pedestal demonstrator for Rolls-Royce SMR, establishing the feasibility of manufacturing a structural component for the proposed nuclear reactor’s seismic isolation system away from the final construction site.
The prototype was manufactured and trialled at Cementation Skanska’s Bentley Works facility in Doncaster. Its completion follows a contract awarded in January 2026 to examine how a precast bearing pedestal could be produced through a controlled manufacturing process and subsequently incorporated into a nuclear power plant.
Skanska confirmed completion on 18 November, identifying the work as part of Rolls-Royce SMR’s programme to test construction methods before using them on future power stations. The trial brought together structural design, civil engineering and manufacturing activities to establish a repeatable approach to producing the component.
The pedestal supports an aseismic bearing, which forms part of the structural system intended to reduce the movement and forces transmitted from the ground into a building during an earthquake. In the Rolls-Royce SMR design, the isolation system is positioned beneath the nuclear island.
Seismic isolation works by introducing a controlled interface between the supporting ground structure and the equipment or buildings above it. Rather than allowing every movement of the ground to be transferred directly into the supported structure, isolation devices accommodate some relative movement within their specified limits.
The arrangement is intended to reduce the seismic forces experienced by important plant structures and equipment. Its performance depends on the characteristics of the isolation devices, the supported mass, the underlying foundation and the earthquake conditions against which the installation is designed.
The bearing pedestal provides part of the structural interface needed to support those devices. It must maintain the required geometry and transfer forces between the isolation assembly and the surrounding structural elements without compromising the intended movement characteristics of the system.
The component therefore needs to satisfy structural requirements associated with both ordinary operating conditions and the exceptional loads considered in the seismic design. Those requirements include the weight of supported structures and the forces that may arise when the isolation system responds to ground movement.
Precast manufacture introduces its own engineering demands. Reinforcement, embedded connections, concrete placement and dimensional control must be managed so that the completed pedestal can connect correctly with the bearing equipment and adjacent structures.
Dimensional accuracy is particularly important at structural interfaces. If the bearing and its supporting pedestal are not aligned within the permitted tolerances, installation may require additional corrective work or affect how loads are transferred through the assembled system.
Manufacturing the component away from the final construction site allows these activities to be undertaken within a controlled production environment. Inspection records, material checks and dimensional verification can be incorporated into the manufacturing sequence before the component is delivered for installation.
Off-site production also changes the construction programme. A component can potentially be manufactured while other site activities are under way, reducing the amount of fabrication work that must take place after the supporting foundations become available.
That approach introduces transport and lifting requirements which must be included in the design. A precast pedestal needs to withstand handling and installation forces in addition to the loads it will experience when incorporated into the completed power station.
Handling arrangements must account for the component’s dimensions, mass and lifting points. The receiving structure must also be prepared to the required condition before the pedestal can be positioned and connected to the wider isolation system.
Skanska’s demonstrator examined the practical manufacture of the component at Bentley Works and the technical procedures needed to produce it. The company has confirmed that the approach was successfully demonstrated, although it has not published detailed dimensional results or a full programme of structural qualification measurements.
The completed trial should therefore be distinguished from testing the performance of an entire seismic isolation system. A manufacturing demonstrator establishes whether a component and its production method can be delivered; the complete system must still satisfy the engineering requirements applicable to its intended use.
That distinction is especially important in a nuclear installation, where structural components form part of a wider safety case. The design, manufacture, installation and verification of equipment must be documented and assessed against the standards and requirements governing the relevant plant.
Rolls-Royce SMR is developing a pressurised water reactor with a planned electrical output of approximately 470 MWe. Its construction approach is based on standardised components and increased factory manufacture, with the intention of limiting the amount of complex work undertaken at individual power station sites.
Repeated manufacture of common components can establish consistent production procedures and inspection methods. Manufacturing experience from one component may help identify changes to tooling, handling or quality control that can be applied before additional units are produced.
However, the use of a standardised structural component does not remove the need to assess conditions at each proposed nuclear site. Ground characteristics, foundation design and the seismic hazards relevant to a location must still be considered when determining the suitability of the complete installation.
The aseismic system must operate as part of the wider nuclear island structure rather than as a collection of independent components. Bearings, pedestals, foundations and supported equipment must be designed to function together under the loading conditions identified for the power plant.
Skanska’s work also provides information for planning the construction sequence. Producing the pedestal separately from the nuclear site may allow manufacturing and foundation works to progress in parallel, but the final installation remains dependent on correct positioning, inspection and connection.
The demonstrator programme brought together Skanska’s civil engineering and design capabilities with the manufacturing facilities at Bentley Works. This allowed the company to examine production methods and undertake technical trials before the component is included in a live nuclear construction programme.
Rolls-Royce SMR was selected for the UK’s small modular reactor programme through Great British Energy – Nuclear. The technology is also being developed for proposed projects in the Czech Republic and Sweden, although individual developments remain at different stages of project preparation.
Selection of a reactor technology and successful completion of a component demonstrator do not constitute permission to construct or operate a nuclear generating station. Project investment, site-specific engineering, regulatory assessment and construction approvals remain separate requirements.
The Doncaster demonstrator establishes a manufacturing method that can inform subsequent design and delivery work. Further engineering, qualification and project approvals will determine when the pedestal design is used within a complete nuclear power plant’s seismic isolation system.


