Easee enters new ownership while keeping its operating strategy unchanged. Brødrene Jensen has acquired the company, with AWC expected to become majority owner pending approval.
myenergi has secured CoP11 approval for flexible EV charging services. The zappi GLO charger can support behind-the-meter measurement and automated Gridpay participation.
Scania has successfully demonstrated bidirectional megawatt charging for heavy trucks. The test links high-power depot charging with vehicle-to-grid operation and fleet-scale flexibility.
Europe’s battery market now has a standard revenue benchmark tool. Nord Pool and Clean Horizon are tracking simulated BESS earnings across multiple countries, durations, and market routes.
Europe enters summer with stronger capacity but uneven regional resilience. ENTSO-E’s 2026 outlook points to limited localised risks as renewable and battery capacity reshape system operation.
Shoreline Wind and Youwind have linked wind project planning platforms. The integration connects early layout, yield, storage modelling, construction planning, and operational maintenance workflows for wind energy projects.
Britain’s energy cyber strategy sets tougher expectations for critical infrastructure. The four-year plan links Clean Power 2030 delivery with resilience, supplier oversight, digital grid security, and stronger capability across operators and technology providers.
Ofgem has opened funding for new energy network innovation projects.
UK Power Networks is testing hydrogen backup for rural outages. The SHARED project combines electrolysis, storage, fuel cells, and sensor-led controls to assess lower-carbon alternatives to diesel generation.
UK Power Networks has opened distribution data through Python tooling. The ukpyn package helps users access, filter, combine, and analyse Open Data Portal datasets.