Contracting

—



  • NAPIT sets safety conditions for plug-in solar

    NAPIT has outlined safeguards needed for safe plug-in solar deployment. Its response addresses certification, older wiring, socket selection, DNO notification, consumer guidance, and enforcement against non-compliant imports.


  • ECA and BESA tackle data-centre skills gap

    Electrical skills shortages are tightening around Britain’s data-centre development pipeline. ECA and BESA have convened contractors, government, training bodies, and infrastructure specialists to address commissioning, cable jointing, apprenticeships, workforce forecasting, and specialist competence.


  • GRIDSERVE opens 39-bay Markham Vale forecourt

    GRIDSERVE has opened a 39-bay charging forecourt beside the M1. The Markham Vale facility combines 400kW-capable equipment, drive-through commercial-vehicle bays, accessible spaces, rooftop solar generation, and a new high-capacity grid connection.


  • Char.gy wins 3,000-socket Northamptonshire charging rollout

    Char.gy plans more than 3,000 new Northamptonshire public charging sockets. The LEVI-backed programme will use lamp-column and kerbside infrastructure to extend residential charging access while limiting excavation, street disruption, and demand for dedicated roadside equipment.


  • Unicrimp extends ferrule range for larger conductors

    Unicrimp has extended its ferrule range for larger conductors nationwide. New 16mm² and 35mm² sizes support stranded-cable termination in equipment.


  • Unicrimp extends ferrule range for larger conductors

    Collingwood’s Tri Bay combines configurable optics, output, and controls options. The industrial luminaire is designed for warehouses, aisles, and open areas.


  • NAPIT sets safety conditions for plug-in solar

    Excel Energy and Sigenergy are expanding commercial battery deployment together. Their partnership combines solar installation, storage hardware, and energy-management capability.


  • Thorlux marks 90 years of UK lighting manufacture

    Thorlux is marking nine decades of British luminaire manufacturing heritage. The Redditch company is updating its visitor centre and emergency-lighting facilities.


  • Padel floodlight combines glare control and corrosion resistance

    Ansell has developed controlled optics specifically for modern padel courts. Exa C combines glare control, corrosion resistance, and magnetic aiming within an IP66 housing.


  • Modular non-corrosive lighting range expands configuration

    Knightsbridge has built modularity into its non-corrosive commercial lighting range. Helix fittings combine configurable output, sensing, emergency options, and simplified installation features.