KNIPEX has packaged photovoltaic connection tools around repeatable cable preparation. The case combines calibrated crimping, stripping, cutting, and MC4 assembly equipment.
Kewtech has added contact-voltage screening before conventional isolation procedures begin. The KT1700 is designed to warn of hazardous potential on exposed conductive parts.
Fluke’s connected instruments are streamlining high-voltage commercial solar maintenance workflows. AR Power is using simultaneous voltage and current measurement to reduce manual recording and accelerate diagnostics.
Three Scottish industrial sites have completed fully funded rooftop solar. The combined 1.8MWp portfolio is expected to generate 1.39GWh annually.
A London alliance will align electrical training with employer demand. Contractors, colleges, authorities, and industry bodies will coordinate local work-based routes.
Greenwich has completed bespoke LED upgrades across twelve pedestrian subways. Vandal-resistant luminaires and site-specific mounting arrangements address visibility, glare, environmental spill, energy use, and maintenance.
NICEIC’s remote EV course targets nationwide charging installation competence growth. The City & Guilds-accredited Level 3 course covers domestic and small commercial EV charging installations.
ORLEN’s German charging hub raises forecourt electrical demand density sharply. The Elmshorn site combines 16 400kW chargepoints with solar canopy generation and intelligent power sharing.
Outdoor FCU launch adds passive RCD protection for external installations. Click Scolmore’s Aquip66 unit is designed for exposed power applications.
United Infrastructure joins National Grid’s cable delivery framework programme nationwide. The agreement covers 66kV, 132kV, and lower-voltage works.