TCL Packaging has commissioned 1,176 rooftop solar panels at Telford. The insurer specified design uses DC optimised inverters, arc fault monitoring, and integrated emergency shutdown.
ECS has approved two additional courses covering critical electrical competencies. Safe isolation supports building controls card requirements, while emergency lighting training becomes a recognised continuing development route.
IET still wants electrician assessments before plug in solar connections. Stronger product rules do not remove concerns about existing wiring, protection, circuit loading, and multiple devices.
Building safety oversight is tightening across higher risk construction projects. Main contractors face greater scrutiny of subcontractor competence, supervision, inspection, and completed work.
National Highways completed solar and storage upgrades across sixteen sites. The programme combines 825kW of photovoltaics with batteries, heat pumps, and upgraded building systems.
Schools will test standardised contracts for privately financed rooftop solar. The Department for Education pilot covers around 150 institutions and introduces common PPA and land-lease terms for future projects.
Hampshire and Solent have launched a regional electrotechnical skills alliance. Employers, colleges, manufacturers, and public bodies will coordinate training demand, career routes, curriculum development, and progression towards recognised competence.
TRILUX has redesigned lighting across Maastro’s complex radiotherapy treatment rooms. Illuminated ceiling panels, asymmetric corridor lighting, downlights, and adjustable scenes address clinical visibility, patient sightlines, shielding geometry, and maintenance.
Gateway 14 has deployed DALI-2 controls across its innovation centre. Occupancy sensing, daylight harvesting, emergency testing, energy monitoring, and BMS integration support adaptable operation across the £18.8 million development.
Evolt will provide UK service support for KEBA charging systems. The agreement covers driver assistance, site hosts, field maintenance, and mixed AC and DC equipment estates.