North Sea cable planning is shifting from bilateral to basin-wide coordination. A new TSO agreement points to deeper cooperation on offshore cable infrastructure as offshore wind volumes rise.
RES is backing wind sector recruitment through student engagement. The programme links future talent directly with operations, careers, and the wider energy transition.
Siemens and Vulcan are deepening Lionheart’s automation partnership. The agreement links lithium production, renewable energy, heat output, and industrial digitalisation.
Germany’s capacity debate is sharpening around long-duration battery storage. New modelling places storage directly against gas in future security-of-supply procurement.
WindEurope is pressing for faster grids and electrification action. Its Madrid package ties investment, permitting, and manufacturing directly to power system competitiveness.
Exergy3 has secured seed funding for industrial heat expansion plans. The raise backs commercial deployment of thermal storage for high-temperature industrial decarbonisation.
Last Mile has reached a million live utility connections nationwide. The milestone underlines continued growth in multi-utility delivery, ownership, and long-term network adoption.
Britain is widening fixed-price support for existing low-carbon power assets. The move sits alongside wider market reform aimed at cutting constraint costs and reshaping locational signals.
EnBW has started construction of a 100MWh battery in Marbach. The project will connect into TransnetBW’s transmission network and is due online at the end of 2026.
Ofgem and DESNZ have updated industry on connections reform delivery. Queue reductions are beginning to show, but battery storage volumes remain well above projected system requirements.