Two standards bodies are tightening the utility-to-edge data interface now. The agreement links smart meter data structures with flexibility and distributed energy signalling at the grid edge.
Britain’s SMR programme has moved into formal contracted delivery work. The agreement starts site-specific design, planning, and regulatory engagement for the UK’s first small modular reactor projects.
Europe’s wind fleet is approaching a major asset-renewal cycle now. Operators are moving towards decisions on repowering, lifetime extension, and decommissioning across older sites.
NERC is monitoring the grid after a PLC threat warning. The advisory described Iranian-affiliated activity targeting internet-exposed industrial control systems across critical infrastructure sectors, including energy.
EDF has unveiled a €240 million electrification support programme today. The package combines truck charging, industrial connection support, and heat pump incentives under a wider French electrification push.
March pushed Europe’s power transition into the business of delivery. Grid access, procurement, building standards, flexibility markets, and contractor competence all moved closer to the centre of the energy conversation.
InfraVia has merged Mercia Power Response and Balance Power into Supernova Power, creating a UK flexible power platform spanning operating assets, battery development, and energy management.
SP Energy Networks has started a five-year transmission upgrade across central and southern Scotland, combining new substations, line upgrades, cable replacement, and supply-chain contracts under its RIIO-T3 plan.
Italy has moved closer to a larger MACSE storage auction. ARERA has backed Terna’s proposal for a 16GWh requirement in 2029, with later auction volumes to be refined as storage costs, gas prices, and capacity market outcomes evolve.
Accepted energy complaints retreated from 2024 peaks across the market. Billing disputes still dominated, late-year volumes turned higher, and redress reform remains live.