Volue says European battery returns increasingly depend on trading skill. Its research links saturated frequency markets, quarter-hour trading, and degradation management to a more demanding operating model.
ev.energy has already enrolled 10,000 flexible charging assets across Britain. Charge & Earn shifts eligible EV charging while retaining driver requirements and distributes market value to participants and partners.
SSEN is expanding robotic inspections across northern Scotland’s HVDC sites. Seven additional machines will monitor energised converter and switching equipment as the technology moves into routine operation.
Vertiv will acquire UtilityInnovation Group to expand data-centre power capabilities. The $1.45 billion deal adds microgrid controls, switchgear, onsite generation orchestration, and behind-the-meter architecture, subject to regulatory approval.
ABB will modernise Cernavodă Unit 1 control and safety systems. The package supports a 30-year life extension at Romania’s only nuclear power station, covering distributed control, shutdown functions, cybersecurity, and standby diesel controls.
Centrii models severe cyber risk across Britain’s battery storage fleet. Its GRIDLOCK assessment produces a 92% baseline five-year attack probability, although all probability and financial figures are modelled rather than observed.
Ofgem proposes new licence conditions for Britain’s energy code managers. Initial changes cover BSC and REC budgets, cost recovery, delivery plans, performance, and transferred governance responsibilities.
Italy has granted strategic status to Energy Vault’s Sardinian project. The former coal-mining site could host renewable generation, storage, and an AI data centre scaling beyond 100MW.
Infineon and Skeleton will develop new AI data-centre power architectures. Their MoU covers solid-state transformers and high-power systems combining silicon carbide, gallium nitride, and supercapacitors.
Capalo AI will commercially optimise Lithuania’s 168MWh Raseiniai battery project. The three-hour system will participate across wholesale and balancing markets following commissioning.