ABB’s Proteus launch puts utility-scale power conversion under sharper scrutiny. The portfolio targets solar and storage projects where efficiency, harmonics, cooling, and grid-code compliance are increasingly decisive.
Encomara has advanced certification for floating wind connection technology systems. SQUID integrates mooring and electrical connections in one subsea unit.
National Grid is testing shared AI for asset monitoring. Project FoSMo will use common models across transmission and distribution operators.
SSEN Transmission is planning a dedicated high-voltage grid training centre. The Aberdeenshire facility would support network skills as Scotland’s transmission investment programme expands across construction, operation, and maintenance.
CRRC is preparing a European launch for denser storage hardware. The liquid-cooled 6.X system targets higher energy density, smaller site footprints, and lower thermal-management demand for grid-side and commercial storage applications.
TECH-X sponsorship points to lighting’s wider technical agenda for 2026. The LIA event will bring standards, connected lighting, sustainability, and design into one Birmingham conference.
UK grid research keeps overhead transmission firmly in national contention. Government-commissioned studies found undergrounding remains significantly more expensive than overhead lines for major electricity network upgrades.
Britain already buries cables, but not across every voltage level. As transmission projects advance, the pylon debate now turns on cost, capacity, landscape impact, repairability, soil disruption, and how communities share the burden of national infrastructure.
Germany’s DC-coupled pilot tackles solar storage connection constraints head-on directly. Sigenergy, EnBW, and ZSW are testing whether DC architecture can reduce hardware needs and improve solar-plus-storage economics.
Electrical trade counters are being reshaped by multichannel buying habits. Schneider Electric research shows rising demand for online ordering, stock visibility, faster fulfilment, and stronger in-branch expertise.