Statera secures £112m for Exeter battery

Statera secures £112m for Exeter battery

Statera Energy has secured debt financing for its Exeter battery. The £112 million debt package supports a 290 MW/580 MWh installation connecting to the 400 kV transmission network, with energisation targeted for 2028.


IN Brief:

  • Lloyds structured the debt financing alongside Santander, Siemens Bank, and SEB.
  • Statkraft will provide market access and trading execution for five years, with Statera retaining responsibility for trading strategy.
  • The East Devon project is expected to support approximately 160 jobs at peak construction.

Statera Energy has reached financial close on its 290 MW/580 MWh Exeter battery storage development, securing £112 million of debt financing for an installation that will connect to the 400 kV transmission network in East Devon.

Lloyds structured the financing, with Santander, Siemens Financial Services through Siemens Bank, and SEB participating as mandated lead arrangers. The debt package comprises a term loan and a VAT facility. Statera completed the financing process within four months of its August launch and is targeting energisation in 2028.

The developer has also agreed a five-year route-to-market contract with Statkraft. Statera’s own trading team will determine the battery’s commercial operating strategy, while Statkraft will provide access to electricity markets and execute the resulting transactions. The agreement separates commercial dispatch decisions from the infrastructure needed to trade and settle electricity transactions.

Exeter Storage will be located close to National Grid’s existing Exeter substation. Statera identifies a 400 kV connection in its project specifications and has designed the development around a nominal two-hour storage duration. At 290 MW, a fully available 580 MWh battery could theoretically sustain rated output for two hours; its usable capacity at the grid connection will depend on state of charge, electrical losses, operating limits, and auxiliary consumption.

Connection at transmission voltage requires power conversion and voltage transformation between the battery assemblies and the public network. The power conversion equipment regulates the electricity exchanged with the battery, while transformers and switchgear provide the voltage conversion and electrical switching functions needed to connect the installation safely. Statera has not disclosed the battery supplier, transformer configuration, or cell chemistry in its financing announcement.

The developer specifies a response time below one second for the project. Rapid changes in power output can enable batteries to participate in electricity system services that compensate for short-term mismatches between generation and consumption. The duration of any response will still be limited by the energy available in the battery or its remaining capacity to absorb electricity.

Trading in wholesale electricity markets creates different requirements. Charging during a period of relatively low prices and discharging during a later period of higher prices generates a return only where the price difference covers the electricity lost during conversion and storage, alongside the costs associated with using the equipment.

The same energy capacity cannot simultaneously be committed in full to several services. A battery approaching its lower state of charge limit after discharging into the wholesale market may have insufficient energy to provide an upward response to a subsequent system requirement. Conversely, a battery that has already been charged to its upper limit has limited scope to absorb additional electricity.

The dispatch strategy must coordinate these constraints with the available commercial opportunities. Statera’s agreement with Statkraft retains the former’s control over those decisions rather than transferring the complete optimisation function to an external party. The developer has identified wholesale trading, frequency response, the Capacity Market, and the Balancing Mechanism among its intended service capabilities, although individual contracts have not been disclosed.

Local network conditions will also influence when the installation can charge or discharge. A 400 kV connection can provide access to the wider transmission network, but it does not guarantee unrestricted power exchange at all times. The development’s contribution to regional system flexibility will depend on the relationship between operating schedules, electricity generation, demand, and available network capacity.

Statera’s wider portfolio includes its operational 300 MW Thurrock battery and a 680 MW development at Carrington, which reached financial close in November 2025. The company now has approximately 2.5 GW of assets operating or under construction and is targeting more than 5 GW of operational battery capacity by 2030.

The Exeter development will incorporate landscaping, grassland habitats, and a community orchard, with Statera forecasting a biodiversity net gain of approximately 33%. The project is expected to support around 160 jobs at peak construction. A local fund is also planned once the facility enters operation.

The ratio of the project’s nominal storage capacity to its contracted power rating distinguishes it from longer-duration developments designed to sustain output across more trading periods. The £112 million debt financing supports the next phase of delivery rather than representing a confirmed total construction cost. Equipment procurement, civil works, electrical installation, and testing will need to be coordinated with the transmission connection programme before the battery can reach its intended 2028 energisation milestone.