Czech pumped-storage plans revive hydro’s role in grid flexibility nationally. ČEZ will convert part of the Orlík hydropower complex into reversible pumped storage while modernising existing turbine units.
Romania’s compressed-air project revives focus on long-duration electricity grid storage. Airengy and Hagag Europe are targeting salt-cavern storage as Europe searches for alternatives to short-duration lithium systems.
Hungary’s largest battery project moves grid flexibility forward across Europe. Greenvolt’s Buj system adds nearly 289MWh of storage capacity to a market scaling fast from a low operational base.
Europe’s inverter restrictions sharpen cybersecurity concerns for grid-connected renewables projects. The EU funding measure could reshape solar procurement, project economics, and supplier risk assessments across European energy infrastructure.
Ofgem has revised RIIO-ED2 allowances for local distribution reinforcement costs. The decision changes load-related expenditure volume drivers as DNOs manage electrification-driven demand.
Battery storage planning has gained a clearer technical reference point. The ESN guide covers fire safety, land use, noise, biodiversity, cybersecurity, emergency response, traffic, and electromagnetic fields.
Socomec is extending storage hardware across cabinet and containerised systems. SMARTSYS C260 and M5000 cover commercial energy management, EV charging support, utility-scale BESS, and medium-voltage grid services.
Schneider and Kraken are linking grid software with flexibility orchestration. The partnership combines visibility, congestion forecasting, DERMS capability, and AI-led control for utilities and DSOs.
Europe is formalising Mediterranean power infrastructure through new investment structures. T-MED covers renewables, smart grids, interconnectors, storage, cybersecurity, hydrogen corridors, and clean-tech value chains.
JA’s rebrand moves its centre beyond photovoltaic modules alone globally. The structure combines solar, storage, smart energy, and capital services.