LS Marine Solution’s new vessel targets HVDC cable installation capacity. The Türkiye-built CLV is designed for offshore wind grids, fibre-optic cable laying, and long-distance subsea transmission projects.
European battery manufacturing is moving closer to grid storage demand. New Italian and Spanish milestones add LFP cell, pack, and BESS capacity to the region’s flexibility supply chain.
Nexans has secured long-term aluminium supply for grid cable production. The Hydro agreement strengthens conductor sourcing for European medium-voltage, overhead, and subsea high-voltage infrastructure.
DESNZ has updated CfD AR8 rules before auction opening formally. The changes cover connection requirements, appeals evidence, and delivery-body error correction.
Uniper signed Polish solar PPAs with Respect Energy covering 219MWp. The six-year agreements include electricity output and Guarantees of Origin from four PV projects.
Qualitas Energy has fully commissioned Nachtsheim-Luxem wind farm in Germany. The 33.6MW project uses eight Enercon turbines and will generate more than 92 million kWh annually.
Ecowende has delivered first power from Hollandse Kust West offshore. The 760MW Dutch project connects through TenneT’s offshore grid and enters staged commissioning.
ENTSO-E has issued guidance on forced oscillations across European grids. It links inverter-based generation, storage, and RfG 2.0 requirements with stability practice.
Technical webinar will examine networked heat pump delivery models nationwide. GTC will focus on ground arrays, controls, compliance, and operation.
Solar power purchase agreement links EV charging demand with generation. The ten-year deal supports ubitricity’s UK public charging network.