GreenWay has secured financing for central European charging expansion plans. The package will support 2,700 fast and ultra-fast public charge points across Poland, Slovakia, and Croatia by 2028.
char.gy has reached 5,000 installed UK public charge points nationwide. The milestone charger was delivered in Brighton & Hove as local authorities expand kerbside infrastructure for drivers without off-street parking.
RAW Charging has opened a 26-bay Manchester EV charging hub.
Tion will supply solar power to IONITY’s German network. The long-term agreement will support renewable electricity procurement for high-power EV charging infrastructure from 2027.
BetterFleet will manage charging for Metropolitan Police electric vehicles. The software will prioritise critical vehicles across depots and public networks.
Reading will install 2,600 on-street electric vehicle charge points. The rollout targets residential areas where homes lack driveway charging access.
Pod has acquired EO Charging to expand depot charging capability. The deal adds fleet software, energy management, and commercial charging expertise.
Fastned has secured approval for a 36-bay London charging hub. The Hanger Lane site will provide ultra-rapid 400kW charging and is expected to open in early 2027.
NGEN is expanding software-led battery control across European energy markets. Its SG Brain platform combines AI, storage dispatch, market signals, and real-time system optimisation.
Fraunhofer ISE has modelled depot charging for electric truck fleets using PV, battery storage, and energy management. The study found electricity cost reductions of up to 62.5% while keeping the logistics site within a 2MW grid connection.