Enviromena has energised Rhigos Road under commercial direct-supply solar arrangements. The South Wales solar farm uses a licence-exempt PPA structure with Evolve Energy.
Svea Solar Utility has secured €185m for Swedish renewables growth. The HoldCo facility will support utility-scale solar PV and storage assets across the project lifecycle.
ELIRE Maritime has validated floating hydrogen shore-power technology for ports. The hub combines fuel cells, 45MWh of battery storage, and 6.6kV/11kV shore-power connections.
E.ON warns smart homes investment is needed for fairer transition. A new report with the Purpose Coalition calls for wider access to batteries, flexibility and local energy systems to reduce bills structurally.
India’s rooftop solar market added 2.7GW in one quarter alone. Residential systems drove the expansion as approvals, subsidies, and state implementation support accelerated deployment.
Eelpower has acquired another Devon battery project near grid infrastructure. The 50MW/100MWh Stoneworthy scheme is planned for construction in 2027 and operation in 2028.
Europe’s battery market now has a standard revenue benchmark tool. Nord Pool and Clean Horizon are tracking simulated BESS earnings across multiple countries, durations, and market routes.
Germany has preserved grid-fee relief for qualifying battery storage projects. The decision gives late-stage developers clearer cost assumptions before the August 2029 commissioning deadline.
Spain will use capacity payments to protect supply security margins. The €9bn mechanism will support available generation, storage, and demand-side resources through 2036.
Europe enters summer with stronger capacity but uneven regional resilience. ENTSO-E’s 2026 outlook points to limited localised risks as renewable and battery capacity reshape system operation.