Encavis is entering Italian storage with a four-hour battery project. The 65MW/260MWh Ceprano system is scheduled for commissioning in 2028 and extends the company’s Italian platform beyond its established solar portfolio.
France is widening renewable curtailment rules as negative prices deepen. The threshold will fall from 10MW to 1MW in two stages, extending remote shutdown requirements across a much larger share of supported solar and wind generation.
Germany is redesigning offshore wind auctions around stronger revenue certainty. The draft retains the 70GW-by-2045 target while proposing two-sided CfDs, annual tenders of 2GW to 4.8GW, and a 35-year standard operating period.
Enefit has commissioned its largest Polish solar farm at Strzałkowo. The 45MW plant is expected to generate around 45GWh annually and raises the group’s Polish renewable portfolio to 78MW.
Rubix will supply MRO products for Hinkley Point C construction. The three-year EDF agreement includes managed inventory and technical support while explicitly excluding equipment used within the nuclear reactors.
Romania has redirected Danube flows to protect Cernavoda nuclear output. The intervention has extended the remaining reactor’s operating window as river levels continue to fall.
Venezuela’s electricity crisis is spreading deeper into Caracas this summer. Daily outages are exposing severe generation shortages alongside transmission, maintenance, and distribution problems that require system-wide rehabilitation rather than isolated equipment repairs.
Vistra’s second-quarter earnings strengthened as wholesale power markets tightened further. Adjusted EBITDA rose more than 30%, while the generation fleet maintained at least 97% commercial availability during recent extreme heat in Texas and PJM.
Nvidia is reportedly preparing a major investment in Lancium’s infrastructure. The proposed deal would connect AI semiconductor capital directly with the gigawatt-scale electrical systems needed to support the Stargate data-centre programme in Texas.
Britain restricted electricity exports during July heatwave system stress periods. NESO reduced day-ahead export capacity to zero on selected European interconnectors as domestic operating margins tightened during several morning and evening peaks.