NESO will gain faster access to rotating demand cuts nationwide. Ofgem-approved Grid and Distribution Code changes take effect on 13 August, formalising the Demand Control Rotation Protocol for short-term electricity supply shortages.
Construction has started on Windyhill’s 200MW Scottish battery storage project. Mitie will deliver the 132kV connection and electrical balance of plant for the first 400MWh phase.
Pembroke’s new synchronous condenser is now supporting Britain’s grid stability. The RWE installation supplies inertia without generating electricity as conventional synchronous generation becomes less frequently connected.
Mayr is adapting wind turbine brakes for stricter safety requirements. Its latest pitch, yaw, and monitoring systems combine low-temperature capability with sensorless condition monitoring for maintenance teams.
Flir’s Chinese field case applies thermal imaging across photovoltaic maintenance. The feature examines defect detection, inspection safety, and the limits of supplier-reported results.
Government plans could simplify preliminary surveys for English network projects. Proposed permitted development rights would cover specified temporary, low-impact investigations.
Hercules has launched a dedicated UK power and energy division. The operation builds on £20.8 million of contracted work and will be reported separately from the group’s labour-supply and construction businesses.
New Zealand’s regulator has opened consultation on a grid-frequency event. Its draft finding attributes the October 2025 incident to system-operator omissions involving outage assessment and voltage-angle conditions.
Hercules has launched a dedicated UK power and energy division. It builds on Advantage NRG’s £20.8 million contracted workload and places the activity under a separate management and reporting structure.
Innovate UK has opened a £3 million ultra-long-duration storage competition. Development studies must support electrochemical systems capable of supplying continuous power for at least 100 hours and operating for 25 years.