European Energy has brought its first Greek wind farm online. The 27MW Tsoukes Sarres project uses six Vestas turbines and is jointly owned with Sampension.
Saft will supply LFP batteries for Germany’s digital railway interlockings. Initial Flex’ion systems are being deployed around Stuttgart to protect signalling and control equipment against power interruptions.
Nadara has brought its 227MW Big Fish agrivoltaic project online. The Sicilian development combines large scale solar generation with continued agricultural use across a 400-hectare site.
R&S Group has signed a transformer framework agreement with NeXtWind. ZREW will supply power transformers as NeXtWind advances its German wind repowering portfolio.
ABL will provide marine assurance for Germany’s Ostwind 4 connection. The 2GW project will use 525kV HVDC technology to move Baltic offshore wind power to the transmission network.
Taaleri has invested in Estonia’s 420MWh Raudsepa battery storage project. Construction is starting this month, with full operation expected by November 2027.
Spain has opened consultations covering eleven gigawatts of grid access. The proposals cover renewable generation and storage at Just Transition nodes, including a dedicated competitive process for Guardo and Velilla.
Ampeak Energy says AW1 battery construction remains on its programme. Interim results also show lower revenue, reduced tidal generation and a continuing requirement for further group funding.
UK Power Networks has opened DERMS access to IDNO customers. The change allows flexible demand and generation connections to use available network capacity without waiting for conventional reinforcement.
UK Power Networks is applying AI to business demand data. Millions of half-hourly readings will inform low voltage planning, investment decisions and customer connections.