Distribution

—



  • UK Power Networks advances AI wayleave platform

    UK Power Networks is digitising land-access agreements with artificial intelligence. Wayl‑Ease combines image recognition, mapping, automated workflows, and digital contracting as the network operator moves the consent platform through its beta-stage development.


  • UK Power Networks advances AI wayleave platform

    NESO will gain faster access to rotating demand cuts nationwide. Ofgem-approved Grid and Distribution Code changes take effect on 13 August, formalising the Demand Control Rotation Protocol for short-term electricity supply shortages.


  • France lowers renewable curtailment threshold to 1MW

    France is widening renewable curtailment rules as negative prices deepen. The threshold will fall from 10MW to 1MW in two stages, extending remote shutdown requirements across a much larger share of supported solar and wind generation.


  • Pembroke condenser enters grid stability service

    Pembroke’s new synchronous condenser is now supporting Britain’s grid stability. The RWE installation supplies inertia without generating electricity as conventional synchronous generation becomes less frequently connected.


  • Venezuela grid failures spread deeper into Caracas

    Venezuela’s electricity crisis is spreading deeper into Caracas this summer. Daily outages are exposing severe generation shortages alongside transmission, maintenance, and distribution problems that require system-wide rehabilitation rather than isolated equipment repairs.


  • Nvidia reportedly plans $3bn Lancium infrastructure investment

    Nvidia is reportedly preparing a major investment in Lancium’s infrastructure. The proposed deal would connect AI semiconductor capital directly with the gigawatt-scale electrical systems needed to support the Stargate data-centre programme in Texas.


  • France lowers renewable curtailment threshold to 1MW

    Britain restricted electricity exports during July heatwave system stress periods. NESO reduced day-ahead export capacity to zero on selected European interconnectors as domestic operating margins tightened during several morning and evening peaks.


  • Harmony Link enters design as Litgrid expands grid

    Litgrid is accelerating transmission upgrades as Lithuanian generation expands rapidly. Harmony Link design work, increased LitPol Link capacity, and LiDAR monitoring form part of a wider programme supporting renewable growth and regional power flows.


  • UK Power Networks advances AI wayleave platform

    Romania has authorised emergency electricity controls during August system stress. Transelectrica may reduce export capacity and, as a last resort, limit specified large industrial consumers between 19:00 and 23:00.


  • Norway sets two-year deadline for grid permits

    Norway plans to halve electricity grid development times across regions. A two-year NVE licensing deadline, simplified assessments, and project prioritisation sit alongside changes intended to accelerate onshore wind construction.