SP Energy Networks and Keen AI have launched IConn, a digital tool designed to speed up early-stage transmission connection assessments by modelling routes, capacity, costs, power flows, and technical constraints in seconds.
ABB is showcasing DC-DC converter technology from its BrightLoop line-up in the GENBETA car during the 2026 Hankook Berlin E-Prix.
Ovia has launched Pitch Finder, a modular LED sports floodlighting platform with 600W, 1200W, and 1800W configurations and modern control options.
Elucian has added a 10kA three-pole plus switched-neutral bi-directional RCBO range for commercial, industrial, renewable, HVAC, and EV charging applications.
Ofgem has rejected CUSC modification CMP344, which sought to change how offshore Income Adjusting Event costs are recovered from transmission users.
MFG EV Power has activated Hubject Plug&Charge across around 2,000 UK rapid and ultra-rapid charge points using ISO 15118 authentication.
National Grid is expanding dynamic line rating technology across 585km of transmission routes in England and Wales to increase usable network capacity.
Copenhagen Infrastructure Partners has launched Perigus Energy after completing its acquisition of Ørsted’s European onshore wind, solar, and battery storage business.
Qualitas Energy has secured permits for 59MW of German onshore wind capacity, including a repowering project in Lower Saxony and a new wind farm in Rhineland-Palatinate.
Sungrow’s iSolarCloud platform has partnered with Frank Energie to aggregate residential PV and storage assets across the Netherlands, Belgium, and Luxembourg.