News

—



  • Electrical bodies warn on plug-in solar safety

    Electrical bodies have warned against rushed plug-in solar deployment nationwide. The joint position highlights protective devices, wiring condition, DNO visibility, product standards, and liability concerns.


  • EDF widens flexibility access for metered assets

    EDF is widening flexibility access for asset-metered distributed technologies nationwide. P483 allows eligible devices on standard-metered sites to join flexibility markets through dedicated asset meters.


  • Wallbox deploys shared-capacity fast charging system

    Wallbox has deployed its first operational shared-capacity fast charging system. The Spanish installation uses dynamic power allocation to reduce grid and space constraints.


  • Mersen combines AC and DC fuse protection

    Mersen has introduced compact protection products for AC/DC power systems. The PCIM launch targets storage, charging, renewables, power conversion, and data-centre infrastructure.


  • European BESS deals widen storage supply pipeline

    European battery storage supply activity is widening across multiple markets. CATL, Rolls-Royce, Fluence, and regional developers are advancing grid-scale projects in Northern Europe, Latvia, and Poland.


  • EU ports strategy puts grid integration in frame

    EU ministers have backed stronger port electrification and grid integration. The conclusions put onshore power, smart grids, and permitting at the centre of future port infrastructure.


  • EDF widens flexibility access for metered assets

    BS 7671 Amendment 4 changes testing in medical electrical locations. Revised Section 710 requirements affect documentation and supplementary bonding records.


  • Ethex takes registrar role for co-op assets

    Ethex will manage member records across three renewable co-operative assets. The arrangement covers former Ripple Energy projects in wind and solar generation.


  • Morgan offshore wind site returns to market

    Morgan is returning to market with its grid agreement retained. The 1.5GW Irish Sea site will be retendered by The Crown Estate.


  • Wallbox deploys shared-capacity fast charging system

    Hampshire has awarded Believ a major public charging concession contract. The programme will deliver more than 17,000 charge points county-wide.