Google and Voltus expand PJM virtual power plant

Google and Voltus expand PJM virtual power plant

Google and Voltus plan a gigawatt-scale virtual power plant programme. The PJM agreement expands a previous 100MW commitment, aggregating demand response and batteries across businesses and homes; the companies have not reported full operational delivery.


IN Brief:

  • Google describes the expanded PJM virtual power plant agreement as 1GW, ten times June’s initial 100MW.
  • Voltus separately describes the expansion as another 1,070MW, without reconciling the published figures.
  • The programme would aggregate flexible electricity demand and storage; enrolled and dispatched capacity remain unconfirmed.

Voltus and Google have expanded their agreement to assemble a gigawatt-scale virtual power plant across the PJM electricity market in the United States. The companies intend to coordinate flexible electricity demand and distributed energy resources from participating homes and businesses, making capacity available when the regional grid is under pressure. The arrangement builds on an initial agreement for up to 100MW announced in June.

Google announced the programme on 22 October as a tenfold increase from the initial 100MW agreement to a 1GW virtual power plant. In its own announcement, Voltus describes the expansion as an additional 1,070MW. The companies do not explain how the figures reconcile, and the difference cannot be resolved from the published statements. The 1GW figure accordingly describes the announced programme, not a verified aggregate of resources already enrolled, accredited or dispatched.

PJM coordinates the wholesale power system covering parts of 13 states and Washington, DC, serving a region the companies describe as containing 67 million people. It must maintain a balance between electricity supplied and consumed while respecting transmission constraints and the requirements of its capacity and other markets. Electricity demand that can be reduced or shifted at suitable times can help limit the need to supply every megawatt of a brief peak through generating plant.

The planned virtual power plant is an aggregated demand response resource, not a single generating station. Voltus expects to coordinate smart thermostats, batteries, industrial demand and other flexible assets distributed across homes and businesses. Depending on how a site operates, an agreed response may reduce electricity consumption, defer it until a different period or supply part of the site’s demand from storage. The portfolio’s contribution is consequently measured through changes in net grid demand, subject to market qualification and measurement rules.

When demand rises, a participating building may temporarily adjust heating or cooling settings within acceptable operating ranges. A battery could discharge to support local consumption or reduce its charging demand, subject to its state of charge and contractual arrangements. An industrial site might defer a process that permits scheduling flexibility. None of those examples assumes that essential production or safety equipment can be interrupted without an agreed operating limit.

The available response from these resources changes with the time of day, weather, customer activity and technical condition. A battery that has already discharged cannot provide the same sustained response again until it has recovered sufficient stored energy. A building’s cooling load is affected by its thermal conditions, while industrial demand is subject to process constraints. Aggregators therefore need information on what can respond, for how long and under which circumstances.

Voltus would need to qualify participating resources under the applicable PJM market rules, coordinate signals to customers and demonstrate their actual response. A customer’s enrolled load is not necessarily equal to the dependable capacity that can be called upon: availability can vary with operating schedules, stored energy and weather. Portfolio controls and meter data therefore need to establish what flexible capacity is available at a particular time, rather than count every connected device at its nameplate rating.

Customers are expected to receive financial benefits through bill savings and direct payments. These arrangements can compensate them for making flexibility available while establishing the limits within which equipment can be controlled. The companies have not disclosed a uniform tariff, aggregate customer payment, project-wide capital expenditure or a complete timetable for reaching the expanded capacity target.

The programme follows a three-year agreement announced in June for up to 100MW of accredited distributed capacity. Google’s ‘bring your own capacity’ approach would fund flexibility resources within the wider PJM region as one response to rising data centre electricity demand. It does not, by itself, supply a particular computing facility through a dedicated wire or guarantee that a local network connection can support additional load; the arrangement concerns a regional electricity market.

A megawatt of flexibility available elsewhere in PJM can contribute to regional system adequacy, but it cannot automatically remove a thermal or voltage constraint at the transformer serving a particular data centre. Local transmission or distribution reinforcement may still be required before a new facility can connect. The new programme is consequently separate from conventional substation, circuit and connection works, even where both help a region accommodate demand growth.

Capacity commitments must also be distinguished from energy delivery. A one-hour reduction in consumption at 1MW corresponds to 1MWh of demand avoided or displaced during that hour, while the same nominal MW reduction sustained for a shorter event involves less energy. Some electricity use may be deferred rather than permanently removed, producing later rebound demand. Battery contribution is additionally constrained by available stored energy, conversion equipment and the time needed for recharging.

Coordination creates another operational requirement: customer sites need reliable communications, permissioned control and records showing when adjustments occurred. Metering information can be used to assess response against an appropriate baseline under the applicable rules. Where a customer withdraws availability, equipment fails or expected load is absent, the aggregator must account for that change rather than assume the full contracted contribution can still be called upon.

The expanded agreement follows Voltus’ separate $225m fundraising earlier in October, which was intended to support growth in distributed flexibility services. The new Google arrangement concerns a specific proposed deployment in PJM, not another financing round. Its progress will depend on enrolling suitable resources and satisfying the market and operating conditions necessary for them to provide reliable capacity.

Google and Voltus have not stated that the expanded programme is fully operating, nor have they published a complete enrolment or accreditation schedule. Its effective grid contribution will depend on how much capacity is qualified, available and delivered when PJM calls for it. The immediate development is a larger commercial commitment to procure flexibility, with operational performance still to be demonstrated.


  • Vattenfall outlines 112MW Everton Carr wind proposal

    Vattenfall outlines 112MW Everton Carr wind proposal

    Vattenfall has proposed a Nottinghamshire wind farm with sixteen turbines. Everton Carr could provide up to 112MW, but its layout, network connection and consent remain under development.


  • ABB and CerilonSoft examine dedicated data centre power systems

    ABB and CerilonSoft examine dedicated data centre power systems

    ABB and CerilonSoft will examine integrated industrial power generation solutions. Their October memorandum covers automation, electrical systems and potential gas generation for data centres, without a selected customer project, generating capacity or delivery timetable.